PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing curtain wall returns at the South Elevation 2.jpg Installing motorized damper controllers at the 2nd floor Facing South.jpg Installing sprinkler main raiser at Stair -2 4th Floor Facing East.jpg Laying out block at the 1st floor Sally ports Facing West.jpg Sprinkler main raiser at Stair -2 Facing East.jpg Started installing panel boards at the electrical room Facing East.jpg VAV boxes at the 2nd floor.jpg
Previous pageNext page Sprinkler main raiser at Stair -2 Facing East
Sprinkler main raiser at Stair -2 Facing East